Thawa Chwea Boarding School – Wastewater Treatment Works (WWTW) Upgrade
Thawa Chwea Boarding School – Wastewater Treatment Works Upgrade & Electrical Optimisation
Scope of Work:
-
30 kW Danfoss VFD reinstatement – Restored to full working condition with both automatic and manual control modes for operational flexibility.
-
Control panel refurbishment and rewiring – Improved reliability and ensured compliance with current electrical standards.
-
New TT earthing system – Designed and installed with a tested earth resistance of 2.62 Ω, significantly better than the <10 Ω requirement for safety and performance.
Key Outcomes::
- Enhanced system safety and protection.
- Improved operational flexibility through dual-mode drive control.
- Reliable wastewater plant operation with minimized downtime.
- Electrical infrastructure upgraded for long-term durability.
30 kW Danfoss VFD reinstatement
Control panel refurbishment & rewiring
New TT earthing
system
Contact Us
Address
Unit 30, Sildale Park, 150 Conveyer Rd, Silvertondale, Silverton, 0181
Phone
+27 (0)12 012 6173
Follow Us










