Wastewater to Potable Water
We specialize in providing tailored solutions for the treatment of industrial and commercial wastewater to potable standards. In partnership with Waterwise Services (Pty) Ltd and under the expertise of leading Professional Process Engineer, Karabo Nthethe (Pr.Eng.), we ensure that the final effluent is safe enough to return to the glass as drinking water.
Client
Waterwise Services (Pty) Ltd
Project Type
Industrial and commercial wastewater to potable treatment at Zebediela Plaza
The Start
The beginning of a green community is a simple container. This plant started off in a B grade high cube unit. Perfectly sized for the filters to fit into it.
Creating Space
We send the container to specialists to fit our lighting, repair existing mechanical flaws and give it a good paint
The Layout
We do a preliminary layout of the filters, motors, pumps, pipes, conduit, trunking, ladders and panel
Meanwhile at the Control Panel
We designed and started manufacturing the control panel for this plant. This plant will make use of LSIS, Weidmuller and Unitronics equipment. Perfect fit for the application all placed into a 304SS 2.4mm Schneider Electric Enclosure.
And on site
The inletworks has been installed on site, but some changes were made to the stormwater system. An additional evaporation dam was added. This section ended up moving
Moving The Inletworks
The new location of the inletworks as depicted on the left.
A hole in the ground
A large hole next to the inletworks was dug and a concrete slab was casted to prepare for the septic tanks.
Factory Installation
Meanwhile, AIS Electrical Engineers were busy installing all RO equipment into the container. Wiring and terminations cables, instrumentation, pumps, fans and dosing units preparing for dry-commissioning
Site Installation
The sewage treatment plant installation taking place where primary treatment, biological treatment and final settlement tanks are being installed.
Site Installation
A side view of the septic system and inletworks.
Site Installation
The assembly of the septic system
Site Team
All of the site work was done by our colleague and client, Waterwise Services PTY (LTD) and an incredible team of local Limpopo artisans.
Panel Testing
Our testing started 19 September 2022. Testing involved ranged from PLC signal testing, instrumentation feedback testing, drive tests, current measurements, power measurements, safety circuit checks, earthing of equipment, DC and AC power checks, M-BUS, WiFi and ethernet checks. Overall the testing off-site took approximately 10 working days to complete. Thanks to great products (Weidmuller, LSIS and Unitronics)
Field Wiring
The installation of all the field cables took place on site. Testing was done on all 18 blowers, compactor, screen, solenoid valves, disinfection pumps, sludge return pumps, septic pumps, float switches and level transmitters.